| Archive Number: | 2016.01.0030 | |
| Title: | Craig Mauzy finishing construction of the steel cage used for digging a well in section ΒΖ. | |
| Personal Name: | Craig Mauzy | |
| Date: | July 2016 | |
| References: | Report: 2016 Excavations Report Page: 2016 Excavations, s. 4 |
|
Classifications Sign in Provide feedback |
|